[2026-08-07 01:20:58] createQuotation started for user 25 company 2 [2026-08-07 01:20:58] Transaction started. Request ID: 2 [2026-08-07 01:20:58] Params: ["QUO-3C50EDD5-V1","2",2,2,"request ","jbjhjhjhjhjbjbjbj","jkgjggjgjgjgj",16802,5,840.1000000000000227373675443232059478759765625,17642.0999999999985448084771633148193359375,null,40,"days",30,30,"milestones","50 down payment \/ 40% \/10",1,3,"years","Excluding paint",1,25] [2026-08-07 01:20:58] Transaction committed. Quotation ID: 1 [2026-08-07 01:38:08] createQuotation started for user 25 company 2 [2026-08-07 01:38:08] Transaction started. Request ID: 2 [2026-08-07 01:38:08] Params: ["QUO-BD0D5312-V2","2",2,2,"request ","jbjhjhjhjhjbjbjbj","jkgjggjgjgjgj",33600,5,1680,35280,null,40,"days",30,30,"milestones","50 down payment \/ 40% for materials delivery \/10 upon finish",1,3,"years","Excluding paint",2,25] [2026-08-07 01:38:08] Transaction committed. Quotation ID: 2 [2026-08-07 17:16:48] createQuotation started for user 25 company 2 [2026-08-07 17:16:48] Transaction started. Request ID: 3 [2026-08-07 17:16:48] Params: ["QUO-DC9A44BC-V1","3",2,2,"canopy ","\u2022\tSupply, fabrication and installation of circular steel columns fabricated from MS Pipe \u00d8219 \u00d7 5.0 mm. \n\u2022\tSupply, fabrication and installation of two (2) horizontal members fabricated from 100 \u00d7 100 \u00d7 5.0 mm MS Square Hollow Sections (SHS), one at the upper level and one at the lower level, connecting the steel columns as per the approved drawings. \n\u2022\tSupply and installation of steel base plates, size 300 \u00d7 300 \u00d7 20 mm, complete with M20 \u00d7 400 mm anchor bolts, washers and nuts. \n\u2022\tSurface preparation and application of two (2) coats of epoxy primer to all steel members. \n\u2022\tAll welding consumables, anchor bolts, bolts, lifting accessories and fixing materials required for a complete installation are included.","\ud83d\udd39 Exclusions\n\u2022\tAll roof works above the top of the steel columns, including the timber supporting structure, timber members, timber cladding, roof covering and all associated accessories, are excluded from this quotation and shall be carried out by others. \n\u2022\tCivil works, concrete foundations, excavation and backfilling are excluded unless otherwise specified. \n\u2022\tElectrical and mechanical works are excluded. \n\u2022\tEngineering design, structural calculations and shop drawings are excluded. \n\u2022\tAny work not specifically mentioned in this quotation is excluded.\n\n\ud83d\udd39 General Notes\n\u2022\tThe steel gazebo structure shall be fabricated and installed in accordance with the approved drawings and specifications. \n\u2022\tKhouri General Smithery Est. shall not be responsible for the structural condition or load-bearing capacity of the existing concrete structure or foundations. \n\u2022\tAny modification to the approved drawings, dimensions, specifications or project scope shall be treated as a variation order and may affect both the contract value and the delivery period. \n\u2022\tAll works shall be executed in accordance with good engineering practice and the approved drawings. \n\n\ud83d\udd39 Site Requirements & Client Responsibilities\n\u2022\tClear and safe access to the work area shall be provided throughout the execution period. \n\u2022\tThe required setting-out and finished levels shall be provided by the Client and verified by both parties prior to commencement of the works. \n\u2022\tSuitable scaffolding, lifting equipment and crane access, where required, shall be provided by the Client. \n\u2022\tContinuous electricity supply shall be available at the site throughout the execution period. \n\u2022\tAdequate working space and material storage area shall be provided by the Client.",20004,5,1000.200000000000045474735088646411895751953125,21004.20000000000072759576141834259033203125,null,15,"days",1,1,"milestones","50 down payment \/ %40 \/ %10",1,3,"years","1- Any Doors, Windows, Fire Exit Doors, Louvers, Fans, Ridge Ventilators, False Ceilings,\nRolling shutter and supporting frames are excluded and not in our scope.\n2- No supporting systems for others works, ie. Fascia, Canopies .. . etc.\n3- Any testing and inspections are excluded and not our responsibility.\n4- Any delay in approval and alternation to the work will result in delaying the completion\nof work.\n5- Any delay in payments will result in delaying the completion of work and handing over.\n6- Any other items not mentioned in our quote are excluded and not our responsibility.\n7- Electricity shall be provided at the time of Installation.\n8- Any kind of permissions, gate pass for material delivery & erectors shall be provided by\nclient.\n9- Any type of fire proof painting is not considered in our quote.\n10- Clear and compacted ground shall be provided for workers.\n11- Supply and installation of ACP cladding & windows are excluded from our scope of\nworks.",1,25] [2026-08-07 17:16:48] Transaction committed. Quotation ID: 3